Turn key project 1000L per hour pasteurized milk production line
Part 1. Basic technical parameters of this project
1. Product Variety: 1000L/H dairy production line.
2. Raw material: fresh milk and milk powder
3. Filling machine: plastic pouch
Part 2: Processing line flow
a. Milk reception and storage unit
b. Blending unit
c. Homogenizing and pasteurizing Unit
d. Filling unit
e. Cip cleaning unit
f. Installation unit
Part 3: Processing machines parameter
A-1 | electronic scale | | Maximum weighing 500kg |
A-2 | milk weighing tank | 300L | Stainless steel SUS304, square sharpe,singel layer,CIP cleaning ball,adjustable legs |
A-3 | Milk reception tank | 500L | Stainless steel SUS304, square sharpe,singel layer,CIP cleaning ball,adjustable legs |
A-4 | milk Pump | 5T/h | SUS304, pump lift 24M, mechanical sealing,inner polished |
A-5 | double pipe filters | 5T/h | Stainless steel SUS304,double pipe,stainless steel filter,250 mesh |
A-6 | Plate cooler | 5T/h | SUS304,Tm=30℃,cooled with chilled water |
A-7 | Storage tank | 3000L | Stainless steel SUS304, Double layers, with decentration agitator, CIP cleaning ball,manhole,digital thermometer,glass tube gauge,sample valve, ladders,adjustable legs, |
A-8 | Milk Pump | 5T/h | SUS304, pump lift 24M, Mechanical sealing,inner polished |
A-4 | milk Pump | 5T/h | SUS304, pump lift 24M, mechanical sealing,inner polished |
A-5 | double pipe filters | 5T/h | Stainless steel SUS304,double pipe,stainless steel filter,250 mesh |
A-6 | Plate cooler | 5T/h | SUS304,Tm=30℃,cooled with chilled water |
A- 7 | Storage tank | 3000L | Stainless steel SUS304, Double layers, with decentration agitator, CIP cleaning ball,manhole,digital thermometer,glass tube gauge,sample valve, ladders,adjustable legs, |
A-8 | Milk Pump | 5T/h | SUS304, pump lift 24M, Mechanical sealing,inner polished |
Commercial terms
*Terms of Payment: 30% TT as down payment, the balance beofre loading,
or 100%L/C at sight against shipping documents ;
*Offer duration and Validity: the quote be valid in 30 days since the price date
*Delivery time:
120 days after receive TT deposit or formal 100% L/C, upon approval on technical drawings and specifications by client.
*Duration of Guarantee:
1.within 12 months since the installation and commissioning of equipment are finished, If the defects of equipment and spare parts result from the seller, the seller will supply spare parts and maintenance by free of charge. If the defects result from the buyer’s improper use of equipment, seller will charge the cost of maintenance and spare parts.
2.After 12 months since the installation finished, if the equipment and spare parts are defected, the seller will charge the cost of maintenance and spare parts.
3. If Buyer request Seller and engineer to Buyer's factory, buyer should supply seller’s workers the round trip air tickets and $80 dollars for each worker per day. And the local traffic, accommodation and lodging fees should also be available.
*installation terms:
1.50 days for installation and commissioning.
2.BEYOND CO., provide installation, commissioning of all equipment supplied by BEYOND CO., as stated in the quotations.
3.buyer provide round way air tickets,local traffic , room and board,in addition pay $100 per day for each engineer.