Product Description
Plastic crates cleaning machine
Plastic crate washing machine is used to wash the crates that contain packages for juice and other foods;
It has the advantages of high automatic, washing completely, saving labor, avoiding chemicals solvents or reagents etc.
Structure: Made of stainless steel, it is composed of machine body, platform, driving system, water pump, Spraying water section etc.
There are several spraying parts to be chosen as well as different washing liquid
in accordance with different types of crates to be washed.
Usage: mainly used to wash the plastic crates, for example the storage crates of milk bottle, juice bottle and beer bottles.
Technical parameter
Model | Capacity | Steam consumption | Cooling water consumption | Electric consumption | Dimension (L*W*H) |
BYXXJI-3 | 300 pcs/H | 250KG/H | 300(KG/H) | 9.1KW | 700*1250*1110 |
BYXXJI-6 | 600 pcs/H | 400KG/H | 450(KG/H) | 17.2KW | 1350*1380*1200 |
BYXXJI-8 | 800 pcs/H | 500KG/H | 500(KG/H) | 18KW | 1650*1380*1250 |
Condition: New
Brand name: Shanghai Beyond;
Type: whole processing Line/turnkey project/fruit and vegetables processing/dairy processing/beverage processing
Voltage: 220v/380v
Power(W): 100-200kw
Weight: Different size different weight/customized
Dimension(L*W*H): Different size different dimension/customized
Certification: CE&ISO
Warranty: 12 months/1 year
After-sales Service Provided: Engineers available to service machinery overseas
Main material: SUS304 or SUS316
Control type: automatic, semi-automatic
energy consumption: Low consumption with high efficiency
capacity: 500-10000L/H-customized
installation period: 1-3months
Period time: 30 days-120 days
Cups material: pouches, paper box, glass bottle, pet bottle, glass bottle
Product storage condition: room temperature; low temperature;
Packaging & Shipping
packaging details: 1.the equipment will be first wrapped by plastic film
2.then we will make sainless steel supported with styrofoam on it under the equipments
3.lastly the equipment will be put in wood crates
Delivery time: 30-60 days
Our Services
Engineer will be sent for the commissiong work and also be responsible for trainment of customer's workers.